欧美不在线-欧美操-欧美操操-欧美操操操-四虎免费在线-四虎免费在线播放

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 成年女人在线观看片免费视频 | 国产美女在线精品免费观看 | 国产中日韩一区二区三区 | 国产成人亚洲精品91专区手机 | 国产小视频在线观看免费 | 国产jizzjizz视频免费看 | 嫩草精品| 久久深夜视频 | 国产精品最新资源网 | 成人午夜性视频欧美成人 | 国产精品白丝在线观看有码 | 国产一级毛片夜一级毛片 | 国产免费久久精品久久久 | 国产精品国产三级国产普通 | 国产福利在线 | 美女发福视频在线免费看 | 免费一级毛片麻豆精品 | 好湿好紧好痛a级是免费视频 | 国产三级免费观看 | 高清精品一区二区三区一区 | 精品国产91久久久久 | 成年女人毛片免费观看不卡 | 黄色片在线视频 | 国产美女一级毛片 | 久久精品一区二区三区四区 | 久久精品国产亚洲7777 | 国产女主播在线播放一区二区 | 国产精品久久久一区二区三区 | 国产一区在线视频 | 韩国三级特黄60分钟在线播放 | 久久综合九色综合欧美9v777 | 国产三级在线视频播放线 | 国产麻豆媒一区一区二区三区 | 国产精品久久天天影视 | 毛片免费40分钟视频 | 国产精品白丝在线观看有码 | 国产精品合集久久久久青苹果 | 久久艹久久 | 国产精品成人观看视频国产奇米 | 国产99久9在线 | 国产一级黄色片子 |